chore(deps): update zricethezav/gitleaks docker tag to v8.21.1 #35

Merged
renovate merged 1 commit from renovate/zricethezav-gitleaks-8.x into main 2024-10-18 16:06:29 +02:00
Collaborator

This PR contains the following updates:

Package Type Update Change
zricethezav/gitleaks docker patch v8.21.0 -> v8.21.1

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | zricethezav/gitleaks | docker | patch | `v8.21.0` -> `v8.21.1` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOC4xMjQuMSIsInVwZGF0ZWRJblZlciI6IjM4LjEyNC4xIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6W119-->
renovate added 1 commit 2024-10-18 16:06:28 +02:00
chore(deps): update zricethezav/gitleaks docker tag to v8.21.1
All checks were successful
lint, build and push / lint (pull_request) Successful in 4s
lint, build and push / build (pull_request) Successful in 1m5s
e67ad9f942
renovate scheduled this pull request to auto merge when all checks succeed 2024-10-18 16:06:29 +02:00
renovate merged commit 8b35590be7 into main 2024-10-18 16:06:29 +02:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: container-images/fpm#35
No description provided.