chore(deps): update alpine docker tag to v3.20.0 #16

Merged
renovate merged 1 commit from renovate/alpine-3.x into master 2024-05-23 02:01:54 +02:00
Collaborator

This PR contains the following updates:

Package Type Update Change
alpine final minor 3.19.1 -> 3.20.0

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | alpine | final | minor | `3.19.1` -> `3.20.0` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4zNzEuMSIsInVwZGF0ZWRJblZlciI6IjM3LjM3MS4xIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbXX0=-->
renovate added 1 commit 2024-05-23 02:01:53 +02:00
chore(deps): update alpine docker tag to v3.20.0
Some checks failed
ci/woodpecker/push/lint Pipeline was successful
ci/woodpecker/pr/lint Pipeline was successful
ci/woodpecker/push/build Pipeline failed
ci/woodpecker/pr/build Pipeline was successful
c4014515d6
renovate scheduled this pull request to auto merge when all checks succeed 2024-05-23 02:01:53 +02:00
renovate merged commit 621938d6fa into master 2024-05-23 02:01:54 +02:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: container-images/postfix#16
No description provided.