OpenTTD/regression
Patric Stout aac8c28d73 Fix #7656: destroying a tunnel/bridge now first removes the tracks for cost calculation
This means that for rail tunnel/bridges, the rail is first sold,
and the tunnel/bridge is destroyed after. This means destroying
tunnels/ bridges now often makes you money, instead of costing.

Similar, with road/tram tracks. Destroying a road+tram
tunnel/bridge now costs the same amount of money as first
removing the tram tracks and than destroying the road
tunnel/bridge. Especially as tram tracks generate money when
removing, this is a noticeable difference.
2021-01-08 12:02:25 +01:00
..
regression Fix #7656: destroying a tunnel/bridge now first removes the tracks for cost calculation 2021-01-08 12:02:25 +01:00
stationlist Codechange: move regression outside of bin and make it work via CMake script 2020-06-05 19:36:05 +02:00
regression.cfg Codechange: move regression outside of bin and make it work via CMake script 2020-06-05 19:36:05 +02:00