chore(deps): update dependency alpine_3_20/wget to v1.24.5-r0 #24

Merged
renovate merged 1 commit from renovate/alpine_3_20-wget-1.x into master 2024-06-28 09:13:44 +02:00
Collaborator

This PR contains the following updates:

Package Update Change
alpine_3_20/wget minor 1.21.4-r0 -> 1.24.5-r0

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | alpine_3_20/wget | minor | `1.21.4-r0` -> `1.24.5-r0` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy40MjAuMSIsInVwZGF0ZWRJblZlciI6IjM3LjQyMC4xIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbXX0=-->
renovate added 1 commit 2024-06-28 09:13:43 +02:00
chore(deps): update dependency alpine_3_20/wget to v1.24.5-r0
Some checks failed
ci/woodpecker/pull_request_closed/lint Pipeline was successful
ci/woodpecker/pull_request_closed/build Pipeline was successful
ci/woodpecker/pr/lint Pipeline was successful
ci/woodpecker/pr/build Pipeline was successful
ci/woodpecker/push/lint Pipeline was successful
ci/woodpecker/push/build Pipeline failed
ci/woodpecker/manual/lint Pipeline was successful
ci/woodpecker/manual/build Pipeline was successful
3f0b942b2b
renovate scheduled this pull request to auto merge when all checks succeed 2024-06-28 09:13:44 +02:00
renovate merged commit 3f0b942b2b into master 2024-06-28 09:13:44 +02:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: container-images/httpd#24
No description provided.