chore(deps): update docker docker tag to v26.1.3 #7

Merged
renovate merged 1 commit from renovate/docker-26.x into master 2024-05-17 02:03:16 +02:00
Contributor

This PR contains the following updates:

Package Update Change
docker patch 26.1.2 -> 26.1.3

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | docker | patch | `26.1.2` -> `26.1.3` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4zNjMuOSIsInVwZGF0ZWRJblZlciI6IjM3LjM2My45IiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbXX0=-->
renovate added 1 commit 2024-05-17 02:01:59 +02:00
chore(deps): update docker docker tag to v26.1.3
All checks were successful
ci/woodpecker/pr/lint Pipeline was successful
ci/woodpecker/pr/build Pipeline was successful
ci/woodpecker/pull_request_closed/lint Pipeline was successful
ci/woodpecker/pull_request_closed/build Pipeline was successful
ci/woodpecker/push/lint Pipeline was successful
ci/woodpecker/push/build Pipeline was successful
5a8b83ed08
renovate merged commit 5a8b83ed08 into master 2024-05-17 02:03:16 +02:00
This repo is archived. You cannot comment on pull requests.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: container-images/pylint#7
No description provided.